Fabrication data
Gerber RS-274X, ODB++, or IPC-D-356. Netlist preferred for flying-probe verification. Indicate layer count, board thickness, copper weight, and surface finish.
Submit your PCB, sensor module, or embedded control program — from 5-unit prototypes to 50,000-unit production runs. Every RFQ is reviewed by a named principal engineer, not a sales queue.
Have these artifacts ready and your quote will move straight into the DFM queue. Missing a file? Tell us in the notes — a principal engineer will respond with what we need.
Gerber RS-274X, ODB++, or IPC-D-356. Netlist preferred for flying-probe verification. Indicate layer count, board thickness, copper weight, and surface finish.
Bill of materials as an .xlsx or .csv with manufacturer part numbers. If approved vendor lists are fixed, attach them. We source from 41 franchised distributors — no brokered parts.
Prototype quantity, NPI quantity, and annual run-rate. Forecast horizon (12 / 24 / 36 months) helps us lock component allocation before allocation windows close.
First-article target date, production need date, and the compliance regime the program must clear — IPC-A-610 Class 2 / Class 3, AS9100D, ISO 13485, CE / FCC pre-compliance.
No black-box forms. Every RFQ moves through four named stages with hard time SLAs and a single point of contact in our NPI engineering team.
A named intake coordinator confirms receipt, validates file integrity (Gerbers open, BOM parses), and assigns your job a Noora tracking ID.
Owner · Intake coordinatorYour assigned principal engineer returns a Design for Manufacturing review — stackup checks, trace/space violations, thermal flags, component lifecycle risk.
Owner · Principal engineer (named)Itemized NRE + unit pricing by volume break, lead times per component group, and test coverage. Compliance-specific surcharges (Class 3, AS9100D, ISO 13485) broken out, never hidden.
Owner · Sales engineeringOn PO, your job transitions to a dedicated program manager and the named principal engineer stays on through first-article inspection. No re-introduction at NPI.
Owner · Program manager + principal engineerFields are labeled like a BOM line item. Required fields are marked with the IPC revision symbol. Uploads are encrypted in transit and at rest.
Aerospace & defense quality system, held continuously since 2017. Zero major non-conformances across the last 28 months.
Medical-device manufacturing certification, held alongside AS9100D and ISO 9001:2015 simultaneously.
Highest IPC acceptance standard for high-reliability electronics. 12 IPC-certified trainers on staff.
Every submission is acknowledged within 24 hours by a named intake coordinator, not an auto-responder.
Reach our sales engineering team in Austin, TX. We answer technical questions about stackups, component allocation, and compliance scope before you commit to a full RFQ submission.